fbpx
icon

Project Details

Project summary

Installation of 2 x systems for a W.I.C in the Pharmaceutical department with a duty share and emergency switch over.

Location

NHS Hospital, London

Equipment

2 x AFR evaporators
2 x J&E Hall condensers
1 x Duty share switch over panel

About the project

Part of a refurbishment project was to install a new walk in chiller within the pharmaceutical department of the hospital. The walk in chiller was designed with a switch over panel and duty share so one system would run at a time and switch over every week. The system has also been designed so if a high temperature has been detected due to a failure of one system, then the panel will switch the systems over to ensure the products within the coldroom stays at temperature. The project included a new box build as well as the new refrigeration system and panel.

Client Reviews